Monday, January 10, 2011

Rob and On's House from beginning to completion

Thailand - as I see it.

Rob and On's House from beginning to completion.

Rob and On started building their home in February and completed it in August.  It is located in the center of Chiang Mai and conveniently located near the airport, night bazaar, shopping centers, schools and a local swim club.

Beginning Construction
The architect and builder guaranteed that the house would be done before the baby was born in the middle of August.  However, Tyler was born two weeks early and the builder brought in extra crews and finished the house before Tyler was brought home.  That was quite a feat and very honorable.
 
Coming along quickly.
The house is constructed of concrete and reinforced steel with four bedrooms and four bathrooms.
Starting to look like a house.
All finished.

Our Suite.
The entire house is in shades of green with  matching tiles in the kitchen and bathrooms. It has large windows with beautiful handmade curtains and elegant tie backs and screens.  Our suite is on the first floor with our own bathroom.

The kitchen is well equipped with a large refrigerator, large drawers and cabinets.
Kitchen

The living room and dining room are large and directly connect to the kitchen. From the kitchen window you can see the greenhouse with rows and rows of plants and flowers.




On's Garden


Wall before Willi painted it.

Wall after Willi painted it.
There is a front gate and four walls around the property.  They have their own well.


 Upstairs are three large bedrooms, one a master suite with huge closets and connected bath. They have done a beautiful job with the railings, stairs, fixtures and beautiful granite on the counter tops.
Stairway
A Beautiful Entrance.


No comments: